United States

MIA Runway 12/30 Pavement Rehabilitation-Miami International Airport

The scope of work for Miami International Airport Runway 12/30 Pavement Rehabilitation project includes:

  • pavement milling
  • texturizing
  • new asphalt and concrete pavement construction
  • pavement grooving
  • underground water mains and fire hydrants
  • high mast lighting
  • gravity walls
  • retaining walls
  • drainage and pollution control system replacement marking
  • sodding

The project also includes runway and taxiway airfield light system replacement and upgrades of: conduit, conductor, base cans transformers, grade adjustment, signs, threshold MALSR lighting replacement and maintenance of airfield and landside traffic.

Benefits 

A newly reconstructed runway at one of the busiest airports in the country. Provides new asphalt pavement which will last for years to come. Removal of ponding within the taxiways and runway. Smooth ride for airplanes.